Door Replacement in Singapore: How Long Does It Take? (2026 Lead Times)

by admin | Nov 3, 2026 | Uncategorized | 0 comments

Short answer: door replacement in Singapore with Renovaid Team takes about 6–8 working days for an aluminium bifold toilet door, 10–14 working days for a gate, 14–21 working days for bedroom doors, slide & swing doors and non-fire-rated main doors, and 21–28 working days for a ½-hour fire-rated main door. The clock starts once site measurement is done and the deposit is paid, because every door is made to order for your opening.

“How long will it take?” is one of the questions our customers ask most on WhatsApp, often because they are planning around key collection, a move-in date or visiting relatives. This guide explains the lead time for each product, what happens at each step and how to avoid delays. For prices and designs, see our HDB toilet door replacement, bedroom doors and HDB main doors pages.

Nyatoh plywood main door with black press lock, door replacement in a Choa Chu Kang HDB flat
A varnished nyatoh plywood main door with a black press lock, installed in Choa Chu Kang. See this project.

Door Replacement Lead Times in Singapore (2026)

These are Renovaid Team’s current lead times in working days, counted from site measurement plus deposit. Prices are nett (we are not GST-registered) and include site measurement, delivery, installation and disposal of the old door.

Product Lead time From (nett) Size condition
Aluminium bifold toilet door (basic, premium, top hung) 6–8 working days $189 (1 basic door) Basic: doorways up to 31″ × 82″
Wrought iron or mild steel gate 10–14 working days $550 wrought iron (sale) / $600 mild steel Up to 3ft × 7ft
Slide & swing toilet door 14–21 working days $359 per door Standard size; surcharges confirmed at measurement
Bedroom doors (package, minimum 2) 14–21 working days $375 for 2 hollow core classic doors Up to 3ft × 7ft per door
Main door, non-fire-rated 14–21 working days $500 (nyatoh plywood) Single leaf up to 3ft × 7ft
Main door, ½-hour fire-rated 21–28 working days $870 (nyatoh plywood) Single leaf up to 3ft × 7ft

Lead times are estimates. Around public holidays and festive periods they can be longer: bifold production, for example, can stretch to about 10 working days just before a public holiday. Larger openings, such as a 4ft × 7ft double-leaf main door or gate, are priced separately and confirmed at measurement.

Why Doors Are Not Available Off the Shelf

HDB door openings look similar but are not fully standard, so we make every door to the opening our team measures. We do not keep ex-stock doors for immediate collection, and we cannot fabricate from measurements taken by the homeowner. That is why the lead time starts after site measurement and not when you first enquire.

The good news is that most replacements do not touch your frame. Our basic, premium and top hung bifold doors are installed directly onto the existing frame, including existing PVC frames, with no drilling into the floor tiles. New bedroom and main doors are also fitted to the existing frame, which keeps the work quick and clean.

White top hung roller aluminium bifold toilet door with E7 Ivory acrylic installed in an Upper Boon Keng HDB flat
A top hung roller aluminium bifold toilet door in E7 Ivory acrylic, Upper Boon Keng. Bifold doors have the shortest lead time. See this project.

Step by Step: From First Message to Installation

  1. Choose your product. Ask us anything on WhatsApp first; questions and answers are free.
  2. Book site measurement. Fill in our site measurement form and send us a screenshot. Please allow at least 1–2 working days’ notice. Our admin sends your time slot by WhatsApp between 5pm and 8pm the day before.
  3. Site measurement (about 10–15 minutes). Our team measures the openings and you choose colours and designs from physical samples. It is quick when you have already decided on the design.
  4. Pay the deposit. The deposit is 50% or $100, whichever is higher. Your order goes into production, usually within about 1 working day, and our team emails the invoice.
  5. Tell us your preferred installation date. Just reply in the same chat. Our admin confirms the timing between 5pm and 8pm the day before.
  6. Installation. Installation is done on your booked day; for example, 3 bedroom doors take about 3–4 hours to install. You pay the balance on site after installation.

Site measurements and installations take place within working hours only: Monday to Friday 8am to 5pm and Saturday 8am to 3pm. We are closed on Sundays and public holidays, and we do not offer same-day or urgent installation.

How to Get Your Doors Installed Sooner

  • Decide the design before measurement. Browse the product pages and our project updates so you can confirm colours on the spot.
  • Confirm classic bedroom door designs quickly. Stock has to be reserved, so confirm the design and colour as soon as possible after measurement.
  • Combine products in one measurement visit. If you are changing the main door, gate and toilet doors, have everything measured together. Note that each product has its own production time.
  • Book early before public holidays. The weeks before festive periods are the busiest. Start the process early if you need doors installed before a set date.
  • Choose a fixed time slot if your day is tight. Standard measurement timing follows our daily route. A fixed morning or afternoon slot is available for $40.
Black FBG-02 retro scissor mild steel gate installed at an HDB flat in Choa Chu Kang
A black FBG-02 retro scissor mild steel gate in Choa Chu Kang. Gates take about 10–14 working days. See this project.

Planning Around Key Collection or a Move-In Date

If you are collecting BTO keys or moving into a resale flat, work backwards from your move-in date. Bifold toilet doors need 6–8 working days from measurement and deposit. Bedroom doors, slide & swing doors and non-fire-rated main doors need 14–21 working days. A ½-hour fire-rated main door needs the longest, at 21–28 working days. Our wrought iron gates and mild steel gates sit in the middle. For help choosing a main door, read our HDB main door price guide.

Booking measurement months ahead? That is fine, but prices may not be the same by the time of your order, so we always quote the current price.

FAQ

How long does a toilet door replacement take in Singapore?
Aluminium bifold toilet doors take 6–8 working days from site measurement and deposit, and up to about 10 working days just before a public holiday. Slide & swing doors take 14–21 working days.

How long does it take to replace an HDB main door?
A non-fire-rated main door takes 14–21 working days. A ½-hour fire-rated main door takes 21–28 working days.

Can you install a door on the same day?
No. Every door is made to order after site measurement and deposit, so we do not offer same-day or urgent installation.

Can I send my own measurements to save time?
No. Openings are not fully standard, so our team measures every order, whether HDB, condo or landed. Measurement takes about 10–15 minutes.

How long does the installation itself take?
It depends on the job. For example, installing 3 bedroom doors takes about 3–4 hours.

Do you install on Sundays?
No. We measure and install Monday to Friday from 8am to 5pm and on Saturday from 8am to 3pm. We are closed on Sundays and public holidays.

Get a Quote and a Timeline

Tell us which doors or gates you want to change and when you need them, and we’ll give you a nett price and an estimated timeline. WhatsApp Renovaid Team at +65 9898 9268 (WhatsApp only, no calls), or see our contact page. Renovaid Team is BCA-registered (CR18) and bizSAFE Level 3, with installation islandwide.

Written by

Related Posts

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *