How Long Does It Take to Replace a Door? From Measurement to Installation
An aluminium bifold toilet door is usually ready 6 to 8 working days after site measurement and deposit. Slide & swing doors and bedroom doors take 14 to 21 working days. Installation itself is quick: 2 bifold toilet doors take about 1.5 hours.
Lead times by door type
Lead times are in working days, counted from the day of site measurement and deposit.
| Door type | Ready in |
|---|---|
| Aluminium bifold toilet doors (basic, premium, top hung) | 6 to 8 working days |
| Slide & swing toilet doors | 14 to 21 working days |
| Bedroom doors | 14 to 21 working days |
| Main doors (not fire-rated) | 14 to 21 working days |
| ½-hour fire-rated main doors | 21 to 28 working days |
| Gates | 10 to 14 working days |
Step by step
- Choose your door. Ask us anything on WhatsApp first. Questions are free.
- Book site measurement. Fill in our online form with your preferred date, at least 1 to 2 working days ahead, and send us a screenshot.
- Get your time slot. Our admin WhatsApps you the timing between 5pm and 8pm the day before. Timing follows our daily route plan.
- Site measurement (about 10 to 15 minutes). We measure the opening, and you choose colours from real samples.
- Pay the deposit. Your door then goes into production.
- Pick your installation date. Just tell us in the WhatsApp chat. No form needed.
- Get the installation timing by WhatsApp, between 5pm and 8pm the day before.
- Installation. You pay the balance on site after the door is up.
How long installation takes
- 2 aluminium bifold toilet doors: about 1.5 hours
- 3 bedroom doors: about 3 to 4 hours
We install on your existing frame, so there is no hacking and very little mess. We take the old door away with us.
Can it be done faster?
We don't do same-day or urgent installation, because every door is made to measure for your opening. The fastest way is to book site measurement early and decide your colours on the day.
Common questions
How many days to replace an HDB toilet door?
For an aluminium bifold toilet door, about 6 to 8 working days from site measurement and deposit. A slide & swing door takes 14 to 21 working days.
Why does a door take a week or more?
Every door is made to measure for your opening, because HDB door openings are not all the same size. Production starts after site measurement and deposit.
Can you install on the same day as measurement?
No. We don't do same-day or urgent installation. The door has to be fabricated to your measurements first.
How long is the installation itself?
About 1.5 hours for 2 bifold toilet doors, and about 3 to 4 hours for 3 bedroom doors.
When will I know the exact timing?
Our admin sends you the timing by WhatsApp between 5pm and 8pm the day before, for both site measurement and installation.